Environmental Studies
As we continue to grow as a City in Nature, we are developing more parks and enhancing older parks, so as to improve ecological connectivity and encourage more recreational uses. As part of the planning and development process, we conduct in-depth studies where required, to assess the expected impact of these works on the natural and built environment.
These studies, which are carried out by technical agencies and independent consultancies, provide us with a better understanding of the existing area. They guide our development plans for the areas and ensure that mitigating measures are implemented to minimise the impact of development works on the environment. For example, an Environmental Management and Monitoring Plan (EMMP) would be developed for each site to mitigate and manage any potential impact of development.
We also engage various groups of community stakeholders to strengthen the rigour of the studies. The findings from the studies and feedback received through engagements are carefully considered, together with other Government agencies such as the Urban Redevelopment Authority (URA) and the National Environment Agency (NEA), before a project is allowed to proceed.
This established process adopts a holistic, evidence-based and methodological approach to balance developmental needs with environmental goals in Singapore. This ensures that our projects are undertaken with great care, and that Singaporeans’ present and future housing needs are met.
Past Environmental Study Reports
Site Name
|
Environmental Study Report
|
Clementi Nature Trail (Clementi Forest Stream and Bukit Timah First Diversion Canal)
|
Proposed Nature Trail along Clementi Forest Stream and Bukit Timah First Diversion Canal
EIA report for download
The EIA report is available for public download in the link provided.
The EIA public feedback period has closed.
Please email alicia_soh@nparks.gov.sg for further information.
|
Pulau Ubin |
Enhancement Works For Jetty at Ubin Living Lab
EIA report for download
The EIA report is available for public download in the link provided.
The EIA public feedback period has closed.
Please email konrad_teo@nparks.gov.sg for further information.
|
Pulau Ubin |
Mangrove Restoration Works at Sungei Durian Ponds
EIA report for download
The EIA report is available for public download in the link provided.
The EIA public feedback period has closed.
Please email wee_hong_yuan@nparks.gov.sg for further information.
|
Pulau Ubin
|
Shoreline Restoration Works at Pulau Ubin
The EIA public feedback period has closed and the EIA report is by physical viewing only.
Please email wee_hong_yuan@nparks.gov.sg for further information.
|
Sisters’ Islands Marine Park
|
Enhancement Works to Sisters’ Island Marine Park
The EIA public feedback period has closed and the EIA report is by physical viewing only.
Please email wee_hong_yuan@nparks.gov.sg for further information.
|
Sungei Buloh Nature Reserve
|
Existing Main Bridge West Side Access Demolition Work and Construction of Buggy Shelter
EIA Report for download
The EIA report is available for public download in the link provided.
The EIA public feedback period has closed.
Please email azfar_saad@nparks.gov.sg for further information.
|